|本期目录/Table of Contents|

关于多阶段生产系统技术定价方法(PDF)

《内蒙古大学学报(社会科学版)》[ISSN:1000-9035/CN:22-1262/O4]

期数:
2014年05期
页码:
66-69
栏目:
经济学研究
出版日期:
1900-01-01

文章信息/Info

Title:
On the Technology Pricing Method of the Production System in Various Stages
作者:
特木钦
中国人民大学经济学院, 北京 100872
Author(s):
Temuqin
School of Economics, Renmin University of China, Beijing 100872, China
关键词:
技术定价排污权包络分析
Keywords:
technology pricingdumping rightdata envelopment analysis
分类号:
F26
DOI:
-
文献标识码:
-
摘要:
对于具有多个阶段的生产过程,某个阶段中的一些产出可能为污染品,并且可以通过一定的技术转化为正常品。基于网络包络分析理论,以多阶段生产过程为研究对象,考虑污染品不经过处理情形下的最优预算和无排污权转让的技术定价问题。
Abstract:
For production procedure with multi-stage,we suppose that some outputs of a certain stage are undesirable and can be converted into useful product by some technology.In this paper,the optimal budget with the waste undisposed and technology pricing method with no the waste disposal in the production system with multi-stage are discussed on the basis of the network DEA theory.

参考文献/References

[1] Fare, R., Grosskopf, S. International Production Frontiers: With Dynamic DEA[M]. Boston: Kluwer Academic Publishers, 1996.
[2] Fare, R., Grosskopf, S. Network DEA[J]. Socio-Economic Planning Science, 2000,(34).
[3] Milliman R. Prince. Firm Incentives to Promote Technological Change in Pollution Control[J]. Journal of Environmental Economics and Management, 1989, 17(3).
[4] Fischer. Incentives for Innovation under Different Emissions Permit Allocation Schemes: Auctions, Grandfathering and Output-based[R]. Discussion paper. Resources for the future, 2002.
[5] Paul Leiby, Jonathan Rubin. Inter Temporal Permit Trading for the Control of Greenhouse Gas Emissions[J]. Environmental and Resource Economics, 2003, 19(3).
[6] Wei Q.L., Chang T.S. Optimal Profit-maximizing System Design Data Envelopment Analysis Models[J]. Computers & Industrial Engineering , 2011,(61).

备注/Memo

备注/Memo:
收稿日期:2014-6-30;改回日期:。
基金项目:中国青少年发展创新团队项目
作者简介:特木钦,男,蒙古族,内蒙古呼和浩特市人,中国人民大学经济学院;团中央发展研究中心,副研究员。
更新日期/Last Update: 1900-01-01